Mon–Fri 7am–6pm · Sat 8am–2pm

Call (312) 555-0142

Plumbing for bathroom and kitchen remodels

Moving or adding supply and drain lines when a bathroom or kitchen changes layout. We work alongside your contractor, on their schedule, so walls don't close before the plumbing is ready.

A white vessel sink with a chrome faucet against marble tile.

When to bring us in

Ideally before demolition, so the layout is planned around where pipes can actually go.

  • You're moving a sink, toilet, shower or tub to a new spot.
  • You're adding a second sink or a new bathroom.
  • Walls or floors are coming open anyway, and old pipes could be replaced while they're exposed.
  • Your contractor needs a plumber for rough-in and finish.

What we handle

The plumbing. Carpentry, tile and electrical stay with your contractor.

  • Rough-in

    Supply and drain lines run to the new fixture locations before walls and floors close.

  • Replacing old pipe while it's exposed

    If old galvanized or patched pipe turns up behind the wall, we'll show you and price replacing it while access is easy.

  • Finish plumbing

    Setting toilets and sinks, connecting faucets and shower trim, then testing every fixture.

  • Working with your contractor

    We plan our visits around their schedule and tell them what has to be ready before each stage.

How remodel work runs

Remodel plumbing usually takes more than one visit. You still approve each price before work starts, as on every visit.

  1. Walk-through. We see the space and the plans, with your contractor there if possible.
  2. Scope and price by stage. Rough-in and finish are priced so you know what each costs.
  3. Rough-in, checked. Lines are run and checked for leaks before the walls close.
  4. Finish and test. Fixtures go in once tile and cabinets are done, and every one is run.

What to send us first

The more we know before the walk-through, the more useful it is.

  • Plans or a sketch showing where each fixture goes.
  • Fixture choices, with model numbers where you have them.
  • Your contractor's name and number, so we can line up the schedule.
  • Rough dates for demolition and for closing up walls.

What affects the price

You approve the price for each stage before that work starts.

How far things move
Shifting a sink a foot is different from moving a toilet across the room.
Number of fixtures
Each new or moved fixture needs its own supply and drain.
Floors and walls
What's underneath, and how much is already open, changes how lines are run.
Old pipe
Replacing what you find behind the walls is optional and priced separately.
Permits
Some remodel plumbing needs one. We'll say so in the quote and explain how it affects timing.

Questions about remodel plumbing

Do I need my own contractor?

For a remodel, yes. We do the plumbing; framing, drywall, tile and electrical are for your contractor or other trades.

When should we call you?

Before demolition if you can. Planning the plumbing early avoids moving a fixture after the tile is ordered.

Can you just swap a fixture without a remodel?

Yes. Replacing a faucet, toilet or sink in the same spot is fixture work.

Request remodel plumbing

Takes about a minute. We call back during business hours to talk through the project and set up a walk-through.

Hours
Mon–Fri 7am–6pm
Sat 8am–2pm
Phone
(312) 555-0142
Area
Chicago's North Side

A phone number or an email, whichever you'd rather we use.

How soon?

For example: "Moving the vanity to the other wall and adding a second sink. Demolition starts next month; our contractor can meet you."

Portfolio preview: this form checks your answers but doesn't send them anywhere.